Skip to content
Magnus Energy
Aerial view of a ground-mount solar array beside a service road

Impact

Power plants that need no land, no fuel and no transmission line.

Every roof we energise is one. Rooftop solar is the fastest, cleanest capacity the Philippines can add. Here is what our installed base does, and how we count it.

34,871

tonnes CO₂ avoided per year

Avoided each year by 36.9 MWp of Magnus-built capacity, as of March 2026.

An estimate based on design yield, not metered generation.

Commitments

Three commitments

  1. 01

    Build safely.

    Zero lost-time-injury target on every site; full fall-protection on every roof.

  2. 02

    Build locally.

    Crews, engineers and warehousing are Filipino and regional — Dumaguete, Cebu, Luzon, Mindanao.

  3. 03

    Build for everyone.

    The 2023 “Solar for every Juan” lease-to-own campaign, school installations and community hospitals: solar reaches well beyond the largest sites.

Rows of solar panels on a long industrial roof slope

Community

Solar for every Juan

The same engineering goes into every project, whatever its size.

Read how the campaign started

Talk to an engineer, not a salesperson.

Send us your address and a recent electricity bill. We’ll come back with a preliminary design and an indicative proposal.