The client is not named here: the publicity position for this contract has not been confirmed.

A 2.7 MWp array on an aviation maintenance, repair and overhaul facility in Pasay, delivered in 2022 as direct EPC contractor. The Masterfile records 2,764.8 kWp, which matches the 2.7 MWp figure within rounding.

Large-span hangar roofs carry serious arrays and serious constraints. Work inside an airport perimeter runs to airside access control, tool accountability and daily security clearance for every crew member, on top of the ordinary requirements of building on an occupied, operating facility. Our own crews worked the site under full PPE with fall protection, with QA checkpoints at mounting, stringing and commissioning.

The facility’s daytime load profile — hangar lighting, compressed air, workshop equipment and cooling running through daylight hours — is close to the ideal case for rooftop solar, because almost every kilowatt-hour generated is consumed on site at the full grid tariff rather than exported.

Talk to an engineer, not a salesperson.

Send us your address and a recent electricity bill. We’ll come back with a preliminary design and an indicative proposal.