
Project facts
- Capacity
- 103.24 kWp
- Commercial operation
- 2024
- Delivery model
- Solar Lease
- Sector
- Healthcare
- Island group
- Luzon
The client is not named here: the publicity position for this contract has not been confirmed.
A 103.24 kWp system on a healthcare facility in Biñan, Laguna, energised in 2024 under a solar lease. Magnus funded, built, owns and operates the plant; the facility buys the power it produces at a fixed tariff below its grid rate.
A hospital cannot trade reliability for savings, and a lease structure is often what makes the decision possible: there is no capital outlay, the existing grid connection and standby generation are untouched, and the operator carries the performance risk. Solar covers the daytime block of a round-the-clock load rather than attempting to replace it.
Working on a live clinical site means infection-control constraints, controlled access routes and coordination with facilities staff on every visit — during construction and, for the length of the lease, during every maintenance call.
Gallery



Talk to an engineer, not a salesperson.
Send us your address and a recent electricity bill. We’ll come back with a preliminary design and an indicative proposal.
